Members

Sreeja palla's Blog – February 2023 Archive (4)

Will Inductive Charging be the Future of EV Charging

Even though electric vehicle charging is new, the technology has rapidly developed in the recent past. What was previously a technology that allowed an electric vehicle to charge fully in 8 hours has now progressed to allowing full charge within 30 minutes. Demand for charging stations has also increased with the growth in the sales of electric vehicles. Either way, electric vehicle charging can be done through cable or wireless.



1) Charging through a cable (Manual plug in… Continue

Added by sreeja palla on February 14, 2023 at 6:38am — No Comments

Top 7 Largest Hydroelectric Power Plants In India

Here are the top seven largest hydropower projects in India with their hydropower capacity.



Tehri Hydroelectric Power Plant (2400 MW)

Koyna Hydroelectric Project (1960 MW)

Sri Sailam Hydro Power Plant (1670 MW)

Nathpa Jhakri Hydro Power Plant (1500 MW)

Sardar Sarovar Hydroelectric Project (1450 MW)

Bhakra Nangal Hydroelectric Power Plant (1325 MW)

Chamera Hydro Power Plant (1071 MW)





India’s quest for renewable energy sources

With… Continue

Added by sreeja palla on February 13, 2023 at 1:35am — No Comments

How Is 3D Printing Changing the Construction Industry?

3D printing in construction is a technology to watch out for. Recent developments like 3D printed houses and 3D printed buildings have shown a glimpse of the immense potential of 3D printing technology. It can speed up the construction process and timeline, reduce carbon footprint and utilize waste and recycled building material.







However, in its present form, it’s far from achieving scalable adaptability in the mainstream construction industry. Adding to that, the… Continue

Added by sreeja palla on February 9, 2023 at 7:12am — No Comments

What is Modular Construction? Types, Pros and Cons, and Applications

Modular construction refers to offsite building construction under controlled factory setting conditions. Unlike a “stick-built” structure that is built piece by piece, modular structures are produced in “modules” or separate sections. Permanent modular buildings and relocatable modular buildings are the main types of modular construction buildings.







Although the modular construction concept has been around for over 100 years, the unique opportunities of modular… Continue

Added by sreeja palla on February 8, 2023 at 6:45am — No Comments

© 2024   Created by PH the vintage.   Powered by

Badges  |  Report an Issue  |  Terms of Service