Members

Blog Posts

The Miracle Mindset A Program in Miracles Rigorous

Posted by Khalid Shaikh on April 30, 2024 at 10:06am 0 Comments

Central to the teachings of "A Program in Miracles" is the idea of forgiveness as the main element to internal peace and salvation. Unlike mainstream notions of forgiveness, which frequently require pardoning others for perceived wrongdoings, the Course emphasizes forgiveness as a method of publishing the self-imposed barriers to love and healing. By relinquishing issues and judgments, persons may free themselves from the bondage of the pride and experience the major energy of heavenly… Continue

Living Miraculously: A Class in Miracles Class

Posted by Khalid Shaikh on April 30, 2024 at 10:05am 0 Comments

To conclude, A Course in Wonders provides a profound and major journey for those who are willing to embark on the path of spiritual awakening. Through their teachings of forgiveness, wonders, and the energy of your brain, ACIM provides a roadmap to inner peace, healing, and liberation. As people engage having its principles and methods, they locate a profound reality: that enjoy is the only reality, and wonders are its natural expression.





In the labyrinth of life's trip,… Continue

Precautions for construction of artificial turf in sports field

1. Wrinkle:

The length of artificial sports turf is generally very long, so there must be enough manpower during construction. Fold positions must be checked in detail prior to positioning and fixing. During processing, the position must be adjusted every 3 meters by lifting, and the gluing and grinding process can only be used if no creases are found.

The generation of wrinkles is a hidden danger of artificial turf swelling in the later period of use, which will cause the unevenness of the sports field and reduce the service life of artificial turf and the performance of sports functions. Therefore, it must be paid attention to and paid attention to during construction.




2. Warped edge:

1) Insufficient amount of lap glue or poor glue quality

2) When the glue is bonded, the bonding time is not properly controlled. Under normal circumstances, the artificial turf cannot be put down and pasted immediately after brushing the glue. The artificial turf must be put down after about 10 minutes, and the turf must be lapped at the overlapping interface for more than three times with a roller or manual stepping. In order to prevent separation before curing, the interface must be weighed with quartz sand..

Warped edges are the bane of artificial turf. When the edge warping is found, it must be reworked immediately, otherwise the gap in the field will expand rapidly, and the warping of the middle edge will bring great obstacles to the movement of athletes and hidden safety hazards.

3)The amount of sand filling is insufficient and uneven. Generally speaking, artificial turf with a height of 50 mm must be filled with more than 30 kg per square meter. A sufficient sand filling layer can greatly inhibit the occurrence of lap joint warping and prolong the service life of the lawn.




3. Filling and combing process:

In order to meet the requirements of this process, the slope of the artificial grass must be kept at 80-100 degrees. Each time the filling material shall not exceed 30% of the total thickness. At the same time, turn on the grass cleaning machine immediately, hold the fallen grass line comb vertically, and prepare for the next round of filling construction.

Note: A large amount of straw has not been combed and erected.

4. Marking line:

The marking lines are artificial turf made of white grass. Artificial turf markings must be standardized and firm on the basis of accurate measurement and positioning. During the construction process, the following three points should be done well:





1) The width of the marking line should be uniform;

2) The bonding should be firm and standardized. The bottom of the marked artificial turf must be pasted with a lap cloth with a thickness greater than 30cm (10cm on each side). The lawn used for the joint should use lap cloth to connect the marked lawn with the whole .

3) Some arc markings must be dug and cut after the overall lawn construction.

5. Lap margin:

The standard laying must be the distance between the width and the grass line at the junction of the width, which is equal to the distance between the horizontal distances of the lawn. Due to the large lawn area, the weight of each bag is about 600 kg, which brings inconvenience to the construction personnel.




CCGrass artificial turf systems are designed to meet the requirements of full-size football pitches, training centers, and mini-football fields. Our systems are tough and durable, able to withstand intense use. Thanks to our innovative design, our systems provide a top-quality playing surface. If you have questions about our products or services, please feel free to contact us at [email protected] and we will be happy to assist you.

Views: 8

Comment

You need to be a member of On Feet Nation to add comments!

Join On Feet Nation

© 2024   Created by PH the vintage.   Powered by

Badges  |  Report an Issue  |  Terms of Service