Blog Posts

Unlocking Opportunities: Commercial Property Loans and SORA Rates Today in Singapore

Posted by SMART TOWKAY PTE. LTD. on April 25, 2024 at 8:21pm 0 Comments

In the bustling landscape of Singapore's real estate market, investors and entrepreneurs are continually seeking avenues for growth and prosperity. Today, amidst the dynamic economic landscape, two key factors stand out: the SORA rate and the availability of commercial property loans. These elements intertwine to offer unprecedented opportunities for those looking to expand their ventures or invest in commercial properties. Let's delve into the significance of…

Continue

How to Maintenance Wire Braiding Machine

Nowadays, wire braiding machine has been successfully used in many places, usually for weaving clothing, rope, and elastic belt. However, it is worth mentioning that if it is used for a long time, it is bound to be worn or broken down. Therefore, it is necessary to do some major and minor repairs in daily life, and we need to remember some important aspects.
The repair of the wire braiding machine is to dismantle the parts of the mechanical part, arrange and clean them, and replace the parts that are expected to be damaged before the next major repair, and then install and adjust them according to the requirements of minor repair. The time is usually about 24 months after the normal operation of the wire braiding machine.
During major repair, all mechanical parts should be disassembled, cleaned thoroughly, the worn parts should be repaired, the parts beyond the service life should be removed, and then the comprehensive installation and adjustment should be carried out according to the major repair requirements. The major repair is usually carried out after 96 months of the normal operation of the machine.
At the same time, the main goal of key maintenance is to remove the dust and flying flowers from all parts of the machine, clean the wire braiding machine parts and replace the damaged parts, etc. the wire braiding machine with cotton yarn as the main wire braiding machine needs to carry out key maintenance on the parts of the machine after about 6 months of normal operation.
The wire braiding machine can be repaired in 12 months of normal operation. The specific operation is to remove the impeller, walking horse spindle, and tension spring, clean the platform and bearing and then re-install them. The walking horse spindle (walking horse head and yarn tube) can be adjusted again until the machine runs normally and the fabric quality is guaranteed.

Detail review: https://www.chinacabletec.com/

Views: 5

Comment

You need to be a member of On Feet Nation to add comments!

Join On Feet Nation

© 2024   Created by PH the vintage.   Powered by

Badges  |  Report an Issue  |  Terms of Service